The Studio - Fall 1976 - The first pole of 36 is hoisted by the crane into position. Later each pole footing will be pumped with concrete. The terrace steps down three times, with the first floor approximatedly five feet above grade, and will support the studio proper. The ground in its multi-levels will serve for storage and for sculpture construction with the upper structure then becoming a gallery.

BACK